Skip to content

Inspect Check Road and Stake Road Application Results

Inspect Check Road and Stake Road Application Results

To check and document stakeout results import the stake road job and/or the check road job into Infinity.

The objective is to check the stakeout results.

The differences between design coordinates and stakeout results can be:

The differences between design coordinates and stakeout results can be:

  • Seen in the graphical view.
  • Checked in the Inspector > Features tab or in the Infrastructure tab under Checks and Stakes.
  • Saved in a report.

See also:

See also:

Staked Points in Infinity

Reports