Level Lines
Level Lines
Level data can be imported to a project. Its possible for you to edit the name of a level line, as well as the starting height.
Reports in a booking sheet format can be made for the level lines.
Level Line List
Level Line List
Level Line Variable | Description |
---|---|
Level Line ID | Identification of the lines contained in a job. |
Method | Observation method used with a line.The available methods are:BF: BS-FSBFFB: BS-FS-FS-BSBBFF: BS-BS-FS-FSBFBF: BS-FS-BS-FSaBF: alternating BS-FSaBFFB: alternating BS-FS-FS-BSaBBFF: alternating BS-BS-FS-FSaBFBF: alternating BS-FS-BS-FS |
Staff One/Two ID | Identification of the two staffs that have been used for measuring the level line. |
Start Point | The point ID for the first measured point of the level line. |
End Point | The point ID for the last measured point of the level line. |
Stations | Number of stations used in the level line. |
Observations | Total number of observations used in the level line. |
Delta Height | The height difference between start and end height. |
Length | The length of the level line. |
ProcessingMethod | When the line has been processed, which error distribution method was used. |
Misclosure | The calculated height misclosure. |
Height Error/Point | The height misclosure devided by the number of stations. |
Total Dist Balance | Total distance balance considering all stations. |
Total Station Diff | Indicates the sum of all station differences as computed at each station in the level line. |